Restaurant Construction in the Bay Area

Health-department-ready kitchens, dining rooms that seat revenue, and an open date you can put on the invitation.

Restaurant construction is the most regulated, most schedule-critical buildout in commercial work: County Environmental Health reviews every surface and sink, fire wants the hood and suppression system proven, the city wants everything else — and your lease's free-rent window burns while they deliberate. Opening late costs more than building right.

We build restaurants the way operators need them built: site evaluated before the lease is signed (grease, hood path, power, and gas capacity decide your budget), health and building permits run concurrently, equipment coordinated with trades, and inspections scheduled like the milestones they are. From fast-casual counters to full-bar dining rooms, the goal is one number: your open date.

What's included

Commercial Kitchen Construction

Cooklines, Type I/II hoods, fire suppression, walk-ins, and floor systems built to county health standards.

Grease Interceptor Systems

Sizing, siting, and installation — the single most expensive surprise in restaurant buildouts, solved before lease signing.

Dining Rooms & Bars

Seating layouts that maximize covers, bar systems, finishes that survive service, and acoustics guests can talk over.

Second-Generation Conversions

The economical path: adapting former restaurant spaces while upgrading what inspectors will flag.

Health + Building Permits Together

County Environmental Health plan check and city building review run in parallel by our permit team.

Equipment Coordination

Spec, delivery, utility rough-in matching, and startup scheduling with your kitchen-equipment vendors.

How it works

  1. 1

    Site Review (Pre-Lease)

    Hood routing, grease capacity, power/gas, ADA — the real buildout number before you sign.

  2. 2

    Design & Health Plan Check

    Kitchen layout, finish schedules, and equipment specs submitted to county health and city concurrently.

  3. 3

    Permits & Procurement

    Long-lead equipment (hoods, walk-ins) ordered while plan check runs.

  4. 4

    Construction (8–16 weeks)

    Underground plumbing, hood sets, trades, finishes — inspection milestones managed tightly.

  5. 5

    Final Inspections & Opening

    Health final, fire final, building final, certificate of occupancy — then you open.

What it costs

2026 restaurant buildout ranges — Santa Clara County
ProjectTypical RangeNotes
Second-generation refresh$150 – $300 / sq ftExisting hood/grease infrastructure reused
Full conversion (non-restaurant space)$300 – $500+ / sq ftNew kitchen infrastructure throughout
Commercial kitchen alone$150K – $500K+Hood, suppression, equipment, finishes
Grease interceptor (new)$25K – $80KSize and siting dependent

A 2,500 sq ft fast-casual conversion typically lands $600K–$1.1M all-in before furniture and smallwares.

Frequently Asked Questions

How much does it cost to build out a restaurant in the Bay Area?+

2026 ranges: $150–$300/sq ft for second-generation restaurant spaces, $300–$500+ for converting non-restaurant space. A typical 2,500 sq ft buildout runs $600K–$1.1M including kitchen equipment. The lease you choose — specifically existing grease/hood infrastructure — moves the number more than any design decision.

How long does restaurant construction take?+

From lease signing: 6–10 weeks design and health plan check, 8-16 weeks permits (city dependent, concurrent with design where possible), 8–16 weeks construction. Realistic total: 6–10 months. Anyone promising 90 days from signing on a full conversion hasn't met a grease interceptor.

What is a grease interceptor and why does everyone warn me about it?+

A tank (often 750–1,500 gallons) that captures grease before it reaches the sewer — required for nearly all cooking concepts. If your space lacks one sized for your menu, installation means cutting floors or trenching the parking lot: $25K–$80K. It's the first thing we check in a pre-lease site review.

Can you work with my kitchen equipment supplier?+

Yes — that's standard. We coordinate utility rough-ins to your equipment spec book, sequence deliveries with construction, and manage the hood/suppression certification chain between vendor, fire authority, and health.

Do you handle the health department?+

Completely: plan check submittal to County of Santa Clara Environmental Health, finish-schedule compliance (floors, coving, surfaces), correction responses, and the pre-opening inspection walkthrough alongside you.

Available by city

Related Services & Guides

Start your restaurant construction conversation

Honest numbers, one accountable team. We respond within one business day.

Licensed · Bonded · Insured · CSLB #1056408 · Serving all of Silicon Valley